Showing posts with label Chief Minister. Show all posts
Showing posts with label Chief Minister. Show all posts

17 April 2013

PMANE's open letter to Tamil Nadu Chief Minister



April 17, 2013

The Struggle Committee
People’s Movement Against Nuclear Energy (PMANE)
Idinthakarai & P. O. 627 104

The Honorable Chief Minister
Government of Tamil Nadu
Fort St. George
Chennai 600 009

Honorable Chief Minister:

Greetings! Please allow us to bring the following dangerous developments, difficulties and discrepancies in the Koodankulam nuclear power project (KKNPP) to your kind consideration and immediate action:

[1]  Shoddy and Substandard Equipment from ZiO-Podolsk

First and the most important of all, the KKNPP has been constructed with substandard equipment and parts supplied by ZiO-Podolsk, an engineering subsidiary of the Russian company Rosatom. The company’s official website has declared unequivocally: “Over the past few years ZiO produced and implemented a set of equipment for foreign nuclear power plants with VVER-1000: Tianwan (China), Busher (Iran), Kudankulam (India)” (http://aozio.ru/production/ob-atom/). ZiO-Podolsk began shipping shoddy equipment in 2007 or perhaps even earlier. In February 2012, the procurement director, Mr. Sergei Shutov, was arrested for buying low quality and cheap raw material, passing it off as more expensive grade and pocketing the difference. The Federal Security Service, or FSB, the successor organization to the KGB, has been investigating the case that has serious implications for the safety of nuclear power plants built by Russia.

During July 15-18, 2012, the Department of Atomic Energy (DAE) delegation that included Special Secretary Mr. A. P. Joshi, Deputy Secretary Mr. Ninian Kumar and the Manager of the Atomic Energy Commission (AEC) Mr. Dzhogesh Pady visited ZiO-Podolsk and discussed a range of issues related to the preparation for the launch of KKNPP-1, the progress of the KKNPP-2 etc. and signed a number of contracts relating to the implementation of the current phase of the KKNPP. (AtomEnergoMash, Posted 19.07.2012).

However, when we asked the Nuclear Power Corporation of India Ltd. (NPCIL) under RTI on January 28, 2013 for “a list of those equipment and parts that have been supplied by Zio-Podolsk to the KKNPP units,” the NPCIL replied tersely on February 20, 2013 (No. NPCIL/VSB/CPIO/2460/HQ/2013/371): “No Information regarding any investigation against Zio-Podolsk is available to NPCIL.” It is a gross untruth and deception because the top DAE officials had just visited the ZiO-Podolsk and they must have followed up the developments. The NPCIL is hiding serious and important information from the Indian public and misleading the entire nation possibly to protect some Russian and Indian middlemen and profiteers.

When we asked the Atomic Energy Regulatory Board (AERB) on January 28, 2013 for “a list of those equipment and parts that have been supplied by Zio-Podolsk to the KKNPP units” they responded on February 12, 2013 (No. AERB/RSD/RTI/Appl. No. 329/2013/2421) very evasively: “Selection of a company for supplying any equipment to NPCIL, is not under the purview of AERB. However, with respect to Quality Assurance (QA) during design, construction, commissioning and operation, a set of well established AERB documents on QA Codes and Guides are published and they were followed during the safety review of KKNPP.”

Another Russian court has convicted one Mr. Alexander Murach, Director of another notorious Russian company, Informtekh, for fraud and sentenced him to three years in prison for selling counterfeit measuring equipment for nuclear and hydro power plants' turbines. Since shoddy and substandard equipment and parts in a massive nuclear power park pose enormous dangers of epic proportion to millions and millions of innocent people in Tamil Nadu, Kerala and elsewhere, this issue has to be thoroughly and comprehensively probed in collaboration with the officials of Rosatom, Atomstroyexport, Federal Security Service (FSB) and most importantly, with independent nuclear experts in India.

[2] Fiddling with the Reactor Design and Doing an Unauthorized Refit

When the People’s Movement Against Nuclear Energy (PMANE)’s dialogue with the Central Government’s Expert Group got aborted due to the violent attack on us by the anti-social elements belonging to the Congress Party and the Hindu Munnani, you appointed a team of four members to study the KKNPP issue. When that group included Dr. M. R. Srinivasan, the former Chairman of the Atomic Energy Commission (AEC), we objected to his inclusion in the team. However, he continued to be part of the team and we did have a dialogue with the team on February 19, 2012 in Tirunelveli.

During our interaction that was held in the presence of the Tirunelveli District Collector and other officials, Dr. Srinivasan never mentioned once that the DAE had made changes in the core of the reactor. It is also not revealed to the public until now if he and the team included this unauthorized fiddling in the report they submitted to you. However, Dr. Srinivasan has publicly acknowledged now: "We sought an additional safety mechanism well before the Fukushima disaster. The safety mechanism consists of valves. The original reactor design had to be altered and I feel this is the basic cause for delay." According to him, the valves were designed partially in India and Russia and compatibility with the reactor led to some hiccups (http://newindianexpress.com/states/tamil_nadu/article1517314.ece).

After fiddling with the original design of the KKNPP reactors, the Indian authorities went back and did an unauthorized “refit” without revealing the details to anyone. All these things point out the inherent deficiencies of the Russian reactors, their vulnerability due to all the fiddling, and their untrustworthiness after the refit. Since this matter has to do with the lives and sustenance of millions and millions of people, all the relevant details must be made public.

[3] Blaming the Protests for Atomic Inefficiency and Inept Engineering

The Russian and the Indian nuclear authorities are hiding their corruption, wastefulness and inefficiency by conveniently blaming the struggling people for all the delay and cost overrun. The Indian Express newspaper asserts that the “delay is on the supply side from Russia as a whole lot of components have been replaced, some of which had to be shipped in.” The KKNPP sources have also confessed that the “containment vessel of the nuclear core too has been changed since the old one had sprung a leak, which was detected three months ago during testing” (http://newindianexpress.com/states/tamil_nadu/article1517314.ece).

The KKNPP authorities claim that “most components meant for Unit-II that were already in the warehouse were used as replacements for Unit-I.” It is not clear why they were kept in the warehouse since Unit 2 was also being concurrently constructed along with Unit 1. The nuclear authorities are hiding the plain truth that Unit 1 is a complete failure and hence they are trying to revive it with the parts of Unit 2. Nobody knows the total loss that India has suffered because of all these shifting and shuffling.

The Srinivasan-confessed “refit” of KKNPP-1 is being blamed on its “idling for months together because of a major agitation plus litigation in the Supreme Court.” This is an outrageous falsehood! Even when our agitation was going on between September 2011 and March 2012, regular and full-swing maintenance work was going on at the Koodankulam plant on a daily basis. When the Tamil Nadu government changed its stand on our agitation on March 19, 2012 and pushed us to the village of Idinthakarai, the Site Director of KKNPP Reactors I and II, Mr. R.S. Sundar, said the “water chemistry” of the water being used in the coolant was encouraging as proper maintenance had been carried out with skeletal staff during the protests (P. Sudhakar, “Croatian experts to inspect the condition of equipment,” The Hindu, March 23, 2012).

Mr. S. T. Arasu, Senior Maintenance Engineer at KKNPP said: “We have operated all the pumps to measure the vibration level, which is less than the desirable baseline data and it shows the quality of our skilled workforce. Though this section could not be given complete attention during the past five-and-a-half months, the equipment are functioning in an amazing fashion” (P. Sudhakar, “Employees at Kudankulam project site a charged lot,” The Hindu, March 24, 2012).

Mr. Yevgeniy N. Dudkin, the head of the Russian Specialists Group, said that none of the Russian specialists of Atomstroyexport had left the project site during the protests. He pointed out that some additional works needed to be done and said, “It is not a huge work…” (P. Sudhakar and S. Sundar, “Primary coolant pumps to undergo another trial,” The Hindu, March 29, 2012.)

Similarly, when the Supreme Court began its hearing on a batch of petitions in September 2012, they refused to give a ‘stay’ to halt the ongoing work at KKNPP and allowed the authorities to continue with their work. Accordingly, the AERB allowed fuel loading in September 2012 dismissing the feelings and sentiments of millions of struggling people in Tamil Nadu and Kerala.

But now the KKNPP, NPCIL, AERB, and the DAE officials are conveniently blaming their inordinate delay in commissioning the KKNPP-1 on the “corrosion and leakage since sea water was used as the coolant.” If the pipes leak and corrode within such a short time, the government should order a probe into the quality of these pipes, the quality of the various equipment and spares that were sent by the Russians. If these pipes and parts cannot withstand one year of sea water circulation, how are they going to function safely for 40-60 years?

[4] Mounting Costs and Massive Corruption

Every single deal that India has signed with Russia has proved to be a disaster and big loss for India. The INS Vikramaditya/Admiral Gorshkov aircraft carrier has been delayed by five years with the final cost hovering in the $2.9 billion range. The time overrun and cost escalation also plagues another mega Indo-Russian defense deal of upgrading MiG-29 fighter planes. The KKNPP is yet another disaster.

The approved cost of the KKNPP 1 & 2 project is Rs. 13,171 crores. But the DAE and the NPCIL claim that they have spent an additional amount of Rs. 4,000 crores on the non-performing project. Nobody knows the exact end cost of the KKNPP or the breakdown of the final amount. The former AERB Chief, Dr. A. Gopalakrishnan, has claimed that the decision to import 40,000 MW capacity Light Water Reactors (LWRs) in early 2006 was taken without any techno-economic evaluation by the Atomic Energy Commission (AEC) or any other agency. According to Dr. Gopalakrishnan, “The decisions, price negotiations and supply terms are being negotiated by the UPA- 2 government in haste, with the intention of fulfilling the PM’s commitments to these foreign governments and their companies before he demits office. …The decision was merely a quid-pro-quo to give business to the reactor manufacturers in those countries which helped India get a Nuclear Suppliers’ Group (NSG) waiver” (DNA, February 16, 2013).

The Russian nuclear company, Atomstroyexport, has just released its financial statement for the year 2011. The company claims that losses in 2011 were twice bigger than the losses of 2010, and that the company is on the brink of bankruptcy. This has seriously affected the Russian nuclear projects at Koodankulam in India and Busher in Iran <http://www.interfax.ru/business/txt.asp?id=283928>. We wonder if the Indian government is secretly helping the Russian company with its losses and bankruptcy. 

The NPCIL authorities have claimed that the Rs.4,000 crores cost overrun at Koodankulam is due to the “increase in interest during construction (IDC), escalation on works, contractor’s overheads and establishment charges” (RTI reply dated February 20, 2013). It is pertinent to note that the Russian government is not making such financial compensation to India for all the delay and cost overrun in all of the above projects. Instead of explaining these mounting costs and massive irregularities, the Russian Ambassador to India Mr. Alexander Kadakin simply misleads Indians by unnecessary and unacceptable comments on our internal affairs.

[5] Commissioning the KKNPP Every 15 Days

Instead of reporting to the citizens of India inside India about the largest and imported nuclear power park at Koodankulam, the Prime Minister of India goes to South Africa and reassures the President of Russia of its commissioning process (no pun intended). When the Prime Minister had announced in Moscow that the KKNPP would be commissioned “in a couple of weeks” on December 15, 2011, you expressed your dissent and displeasure immediately.

The calendar for commissioning of KKNPP-1 has been shifted some 20 times in the past one year by politicians, bureaucrats and the nuclear authorities. In fact, this “commission dating” process has been going on from 2005 onwards and the Union Minister of State, Mr. V. Narayanasamy has set a record of sorts for himself in this calculated and irresponsible misinformation campaign. All these people have been lying to the nation repeatedly and recklessly and hence we cannot trust these authorities with our and our families’ safety and well-being. If there is any truth and decorum in public life in India, all these officials should resign from their respective posts.

[6] No Information, No Liability, No Pollution Safeguard

The Government of India and the DAE have not shared any basic information with us about the KKNPP. Even after the Central Information Commission (CIC) has instructed them, they have not shared the Site Evaluation Report (SER) and the Safety Analysis Report (SAR) with us. They have not heard our opinions or allayed our fears and concerns about the lack of fresh water resources, the changes in the design of the Reactor Pressure Vessel (RPV), the management of liquid and solid waste and so on.

Neither have the Indian nuclear authorities got any liability from the Russian government and/or companies for KKNPP 1 and 2. The Government of India is not even willing to share the secretive Inter-Governmental Agreement (IGA) that they signed with the Russian government in 2008. Even as we are dealing with KKNPP 1 and 2, the Government of India is announcing the agreement on KKNPP 3 and 4 with utter disregard for the sentiments of the local people and the people of Tamil Nadu as a whole.

The Tamil Nadu Pollution Control Board (TNPCB) has also given consent to discharge enormous amounts of sewage, trade effluent, desalination plant effluent, demineralization effluent, steam generator effluent, suspended solids, dissolved solids, and many other waste products into the sea. The TNPCB fixed the temperature of the effluents at the discharge point as 45 degrees and later summarily reduced it to 36 or 37 degrees. They have also allowed the KKNPP to release significant amounts of Sulphur Dioxide, Nitrogen Dioxide, particulate matters and many other harmful radioactive pollutants into the air. Nobody seems to bother about the impact of all these on the sea, sea food, crops, dairy, food security, nutrition, health and wellbeing of us, our children and grandchildren.

Even as we are awaiting the Supreme Court’s verdict on the Koodankulam case, it is revealed now that the NPCIL does not hold valid and legitimate clearances for all the various buildings and installations in the KKNPP from the Tamil Nadu Coastal Zone Management Authority under the Coastal Regulation Zone Notification of 2011.

[7] The Tamils Get Elegy and the Others Get Energy!

Even though you have written to the Prime Minister on March 31, April 25 and August 19, 2012, demanding all the power from the KKNPP to Tamil Nadu, the Prime Minister or his PMO never even acknowledged your letters. Earlier you had demanded more power from the Central Pool and financial help for various power generation schemes, but the UPA government always ignored your genuine requests and earnest efforts. In fact, most of our pre-March 2012 agitations and processions were in support of your demands and schemes.

If this is the way they treat the Chief Minister of an important State and popular leader of millions of Tamil people, you can possibly imagine the feelings and attitude they may have towards the poorest of the poor who have been struggling on our own for almost two years now. The Delhi elites seem to have scant regards for the Tamil fishermen, Tamil women, and the Tamil people as a whole.

It is also strange that our neighboring states would not share the Nature-given river waters with us but we, the Tamil people, have to suffer nuclear waste, thermal pollution, saline refuse, and most importantly, nuclear radiation and give them all risk-free electricity. It is quite preposterous that the Congress government in Kerala stakes a claim for 500 MW from the KKNPP; in fact, the Congress governments in Delhi and Thiruvananthapuram can together decide to set up a few nuclear power plants somewhere in Kerala. The intelligent and Nature-loving people of Kerala would never allow that and the political parties there, whether Congress or Communists or BJP or others, would never let that happen also.

Given the above situation, may we request you, Madam, to order an inquiry into the construction, equipment, overall quality, performance and the viability of the entire Koodankulam nuclear power project; demand removal of the fuel rods from the core of the Unit 1 reactor; convert the KKNPP into a pro-people and Nature-friendly Model New Energy Park; bring about renewable energy projects all over our State; rectify the transmission and distribution issues, and protect the interests and well-being of the Tamil people and our progeny please.

If we let this shoddy, substandard, unsafe, and corruption-ridden nuclear power project to go critical and fail in our collective historic duty to protect our Tamil people, preserve our Natural resources and prop up the interests of newborn and unborn generations of Tamil Nadu, we all will be held responsible and answerable for all the upcoming calamities and uncalculable harms to our people.

Looking forward to your favorable actions, we send you our best personal regards and all peaceful wishes,

Cordially,

S. P. Udayakumar       M. Pushparayan          Fr. F. Jayakumar         M. P. Jesuraj
Coordinator

R. S. Mugilan              Peter Milton                V. Rajalingam             Ms. S. Lidwin

Copies to:

[1] The Chief Secretary
Government of Tamil Nadu
Secretariat
Fort St. George
Chennai 600 009

[2] The Home Secretary
Government of Tamil Nadu
Secretariat
Fort St. George
Chennai 600 009

[3] The Director General of Police
Post Box No. 601
Dr. Radhakrishnan Salai
Chennai 600 004

[4] The Director General of Police (CB-CID)
3, SIDCO Electronic Complex, I Floor
Guindy
Chennai 600 032

[5] The Assistant Director General of Police
Vigilance and Anti-Corruption
Adyar
Chennai 600 028

20 August 2012

PMANE's open letter to Chief Minister of Tamil Nadu


August 20, 2012

The Struggle Committee
People’s Movement Against Nuclear Energy (PMANE)
Idinthakarai & P. O. 627 104
Phone: 98656 83735

The Honorable Chief Minister
Government of Tamil Nadu
Fort St. George
Chennai 600 009
Fax: 044-24992255, 25671441, 28133510

Honorable Madam:

Greetings! As we have completed a whole year struggling against the Koodankulam Nuclear Power Project (KKNPP), we would like to initiate a fresh round of dialogue with you.

As you know, the Government of India and the Department of Atomic Energy (DAE) have not shared any basic information with us about the KKNPP. Even after the Central Information Commission (CIC) has instructed them, they have not shared the Site Evaluation Report (SER) and the Safety Analysis Report (SAR) with us. They have not heard our opinions or allayed our fears and concerns about the lack of fresh water resources, the changes in the design of the Reactor Pressure Vessel (RPV), the management of liquid and solid waste and so on.

Neither have they got any liability from the Russian government and/or companies for the KKNPP 1 and 2. The Government of India is not even willing to share the secretive Inter-Governmental Agreement (IGA) that they signed with the Russian government in 2008. Even as we are dealing with KKNPP 1 and 2, the Government of India is announcing the agreement on KKNPP 3 and 4 with utter disregard for the sentiments of the local people and the people of Tamil Nadu as a whole.

When the Madras High Court is hearing a batch of petitions against the KKNPP, the Atomic Energy Regulatory Board (AERB) gave consent to load fuel rods in the first unit of KKNPP and the Court has condemned this defiant attitude and behavior of AERB and some Congress ministers. It is so depressing and painful to see such contemptuous treatment of not just the people of India but also the Judiciary.

The Tamil Nadu Pollution Control Board (TNPCB) has also given consent to discharge enormous amounts of sewage, trade effluent, desalination plant effluent, demineralization effluent, steam generator effluent, suspended solids, dissolved solids, and many other waste products into the sea. The TNPCB has fixed the temperature of the effluents at the discharge point as 45 degrees. They have also allowed the KKNPP to release significant amounts of Sulphur Dioxide, Nitrogen Dioxide, particulate matters and many other harmful radioactive pollutants into the air. Nobody seems to bother about the impact of all these on the sea, sea food, crops, dairy, food security, nutrition, health and wellbeing of us, our children and grandchildren.

We have taken note of your recent letter to the Prime Minister dated August 19, 2012 demanding all the power from KKNPP to Tamil Nadu. Even though you have written twice before on March 31 and April 25 this year, the Prime Minister or his PMO has not even acknowledged your letters. Earlier you had demanded more power from the Central Pool and financial help for various power generation schemes, but the UPA government always ignored your genuine requests and earnest efforts. In fact, most of our pre-March 2012 agitations and processions were in support of your demands and schemes.

If this is the way they treat the Chief Minister of an important State and popular leader of millions of Tamil people, you can possibly imagine the feelings and attitude they may have towards the poorest of the poor who have been struggling on our own for more than a year now. The Delhi elites seem to have scant regards for the Tamil fishermen, Tamil women, and the Tamil people as a whole.

It is also strange that our neighboring states would not share the Nature-given river waters with us but we, the Tamil people, have to suffer nuclear waste, thermal pollution, saline refuse, and most importantly, nuclear radiation and give them all risk-free electricity. It is quite preposterous that the Congress government in Kerala stakes a claim for 500 MW from KKNPP; in fact, the Congress governments in Delhi and Thiruvananthapuram can together decide to set up KKNPP 3-6 somewhere in Kerala. The intelligent people of Kerala would never allow that and the political parties there, whether Congress or Communists or BJP or others, would never let that happen also.

It is we, the Tamil people, who are left high and dry by the so-called ‘Tamizhina Thalaivar’, his party that is part of the UPA and a few other parties in Tamil Nadu. When you assumed power in 2011 and stood up for the popular causes of the Tamil people, we heaved a sigh of relief that we had a leader who understood our needs and wants after all. We were so shocked when you reversed your stand on the KKNPP issue in March 2012.

As we pointed out during our meeting with you in September 2011, India needs a more creative and original energy policy and we, the Tamil people, need to protect the Tamil land, water, air, sea, sea food, natural resources and the future for the Tamil progeny. The UPA government in Delhi is keener and hell-bent on pleasing the foreigners and their MNCs and taking care of their and their friends’ self interests.

Most of the people here in our area have been praying to Our Lady of Lourdes at Idinthakarai and to the Sage Vishwamitra in one of his rarest temples in India near Koodankulam with the solemn hope that these divine forces would save them from nuclear threats to their land and the sea. They believe that from Gorbachev and Rajiv Gandhi who initiated the KKNPP to the Russian engineers and scientists who designed the Koodankulam reactors have met with misfortunes. It is only natural for people to turn to supernatural forces when their political energies are dissipated and actions discouraged by the vested interests.

We would very much like to request you, Madam, to turn the KKNPP into a pro-people and Nature-friendly project, bring about solar power policy and projects all over our State, rectify the transmission and distribution issues, protect the interests of the Tamil people, and leave a wonderful legacy of visionary leadership and compassionate development with the people of Tamil Nadu and India.

Looking forward to your favorable actions, we send you our best personal regards and all peaceful wishes,

Cordially,

S. P. Udayakumar       M. Pushparayan          Fr. F. Jayakumar         M. P. Jesuraj    V. Rajalingam
Coordinator

31 December 2011

Expert Team of the PMANE's letter to Chief Minister of Tamil Nadu


December 30, 2011

The Expert Team
The People’s Movement Against Nuclear Energy
Idinthakarai 627 104
Tirunelveli District
98656-83735

The Honorable Chief Minister
Government of Tamil Nadu
Chennai 600 009

Your Excellency:

Greetings! We, the Expert Team of the People’s Movement Against Nuclear Energy (PMANE) has met today at Kanyakurmari and confirms the worst fears of the people that the Nuclear Power Corporation of India (NPCIL) has compromised on safety and failed to perform statutory due diligence. Citing the responses on the matter of siting and the issue of fresh water supply – both critical components in determining safety of the plant – we confirm that NPCIL has compromised on both these aspects.

May we bring your kind attention to the following issues please:

1.      The Koodankulam site is not only prone to small-volume volcanic eruptions, but also to mega-tsunamis with heights exceeding 100 feet, arising out of the presence of two large “slumps” in the seabed of Gulf of Mannar less than 100 km from the plant. A 1982 study in a noted journal documents the presence of two slumps -- the East Comorin slump and the Colombo slump -- in the vicinity of the Koodankulam site. The second report by the Central Govt Expert Group has accepted the presence of the slumps and the possibility of a Near Field Tsunami occurring out of a landslide. This is in opposition to their earlier position and also to the position of AERB that Near field Tsunamis are not possible in India. However, their contention is on the height of the Tsunami waves. While welcoming their change in accepting the possibility of Near Field Tsunami, the PMANE Expert Team wishes to state that after the 1982 study, a tsunami did occur in December 2006 and it may have changed the structures of the Slumps. Hence merely answering the question from the 1982 text is not sufficient.

2.      PMANE’s Expert Team is alarmed that NPCIL has allowed the siting of the plant in an area characterised by sub-volcanic intrusions – an indication of volcanism in the vicinity of the plant. The presence of sub-volcanic intrusions of the kind found in the KKNPP site is precisely the reason why the United States Government abandoned the Yucca Mountain site as a possible waste storage site owing to concerns about the structural integrity. In addition to this, small volume volcanic eruptions have occurred in the KKNPP site’s vicinity from the year 1998.

3.      Studies by ONGC, the Geological Survey of India and numerous other terrestrial and marine geologists confirm the presence of basaltic intrusions into the crust and the Gulf of Mannar seabed. Their findings tell us that the Gulf of Mannar sea bed has been thinned because of this. Its thickness is a mere 1,000 to 5,000 metres instead of average 40,000 metres for continental crust.

4.      Scientists from various national institutes have published as late as 2010 that the crustal thickness of Koodankulam site is much thinner than the Gulf of Mannar Crust because of similar sub-volcanic intrusions. Ground Magnetic Surveys conducted by them have suggested that the Crustal thickness is a mere 150 to 200 metres at Koodankulam site.

5.      The entire Koodankulam region is known for its lime stone formations. Lime stone formations are known to the formation of Sink holes and underground caves. Events that occurred on November 26, 2011 at Pannaiyarkulam, in 2008 at Radhapuram (both located 10 kms from the KKNPP site), and in 1998 at Maruthankulam (25kms from the KKNPP site) have suggested that this is a “KARST” Region. AERB’s safety laws clearly state that if a Karst region is suspected a detailed study has to be conducted. Such a study has not been attempted by the NPCIL.

6.      During the 2004 tsunami the withdrawal of the sea was around 4-5 Kms from the shore. Every year after this tsunami, the some places of the coast of Tamil Nadu have faced the issue of sea water withdrawal at least 3 times a year. Tsunami hazard manual released by the USNRC in March 2009 states that if sea water withdrawal is an issue at the site then the chances of the reactor going in for a dry intake should be studied thoroughly. Dry intake can cause damage to the turbines and reactors. Each minute a reactor needs 5,000 cubic-metres of sea water. Hence a detailed volcanic hazard study, tsunami hazard study and a study about the “Karst” Terrain is a must.

7.      Another crucial failure of the NPCIL is the fact that the plant has been assured supply of freshwater for merely 36 hours and 25 minutes. The dependence on a single source, namely, the desalination plants, further reduces the reliability of this water source because desalination plants rely on the sea and electricity. Both can be disrupted by disturbances in electricity supply and cyclones and extreme weather events in the sea along with Jelly fish intrusions. In such a situation, reactors will have to be closed down immediately and they may have just enough water for maintaining the safety systems for only 10 days. The reserve of potable water for the KKNPP Township is sufficient only for 2 days. The seawater intake pipeline of the Minjur desalination plant in Thiruvallur district was uprooted during the Cyclone Nisha in 2008. Repairing the pipeline required engineers from the Netherlands and it took more than 45 days to mend the pipeline.

8.      Department of Atomic energy (DAE) funded study by Dr. Manjula Datta has found that the morbidity burden in the proximity villages of Kalpakkam is 400% higher than in distant villages. The diseases include Cancer, mental retardation, thyroid problems, infertility, lumps, stroke, cataract, TB, ulcer and diabetes. Another study conducted by Dr. V. Pugazhendhi et. al. showed that auto immune thyroid disease among women living in upto 40 kms from the Kalpakkam site was significantly higher than those living 500 kms away. In another study conducted by the same doctor in 2003 among the Kalpakkam employees and family members had shown that the death rate due to Multiple Myloma (a bone marrow cancer) is statistically significant. Studies based on data supplied by the NPCIL shows that the prevalence of cancer among workers and wives of the BARC and the TAPS is significantly higher than that found in MAPS. The first 2 reactors became critical during the 1960’s and the 1970’s whereas the MAPS came critical during 1984-85. Yet another study shows significant deviation in sex-ratio of children born to employees of the BARC and the TAPS which is indicative of genetic mutations.

9.       The United States and Japan have compensatory laws for employees as well as people living around the plants (such as energy employees’ occupational illness compensation program act) even when the reactors function normally without any leaks or accidents. This clearly shows that Low level Radiation from the reactors is a health hazard.

10.   The airports in European Union have banned the usage of X-rays due to the hazards of low level radiation and there is no safe dose in radiation.

11.  The decommissioning cost of the KKNPP reactors must be taken into account and that cost is at least a few times higher than the commissioning cost. In Fukushima it has been estimated that it will cost 75,000 crores and 30 years to decommission the failed nuclear plants. When we take this into account, all the nuclear plants become unviable and un-economical.

12.   The issue of spent-fuel disposal is an unsolved issue both in terms of technology and economics and spent-fuel will remain highly radioactive for thousands of years.

13.   Only enhancing energy efficiency and developing alternatives will give a sustainable energy solution. Effective energy efficiency measures alone can free up enough electricity to meet all our current needs.

Given this situation, we would like to request Your Excellency to bring up the above issues with the Central Government and the Department of Atomic Energy and persist with your concern for the wellbeing of the people of Tamil Nadu. We would like to request you to accelerate electricity generation from renewable energy sources such as the solar, wind and bio-mass which are available in plenty in Tamil Nadu. We would also like to request you to implement appropriate policies and action for grid connected renewable energy generation and distribution. Tamil Nadu has got great potential for solar energy (25-30 MW per sq. Km.) as we have 300 cloud-free days in a year. We can surely establish Tamil Nadu as a pioneer in renewable energy in India and such a fete can coincide nicely with the “International Year of Sustainable Energy for All.”

We would very much like to request Your Excellency to grant us an opportunity to meet with you and explain our reservations to the implementation of the KKNPP project in detail.

Cordially,
S/d.

1. Mr. M. G. Devasahayam, I.A.S., Convener of PMANE Expert Team

2. Dr. R. S. Lal Mohan,

3. Dr. V. T. Padmanabhan

4. Dr. R. Ramesh

5. Dr. V. Pugazhendi

6. Mr. Soumiya Dutta

7. Adv. T. Lajapathi Rai

8. Prof. P. Sivakumar

9. Mr. G. Sundarrajan, Coordinator of PMANE Expert Team